See the numbers for your project.

No estimates. No guesswork. Real data based on real Northeast projects.

The wood problem

AAC Steel CFS Calculator.

Not a generic industry benchmark. Based on AAC Steel’s proprietary methodology, developed from real Northeast projects.

CFS vs Wood Framing — Cost Analysis

All fields are required to generate the analysis

Please fill all fields before generating the analysis.
Need exact figures?
Request a 48-hour detailed cost analysis tailored to your project specifications.

Analysis results

Steel advantage — total project
—
vs. wood framing on this project
—
CFS total
—
Wood total

Cost breakdown

Wood framing
Type V-B Combustible
Project total
—
—
Base construction—
Structural frame—
Podium structure—
Hidden / risk costs—
Construction financing—
Builder's risk insurance—
Cold-formed steel AAC Steel
Type II-B Non-Combustible (ISO 4)
Project total
—
—
Base construction—
Structural frame—
Podium structure—
Hidden / risk costs—
Construction financing—
Builder's risk insurance—
Schedule savings
—
weeks faster
Insurance reduction
—
vs. wood framing
Project ROI delta
—
CFS over wood

Visual analysis

Total cost comparison

Cost breakdown by category

Construction schedule comparison

—
CFS total months
—
Wood total months
—
Financing difference
Complete cost comparison
Table 1
Cost categoryCFSWoodDifferenceNotes
Regional basis:
Structural frame cost breakdown
Table 3
ComponentCFS ($/SF)CFS totalWood ($/SF)Wood totalNotes
Hidden & risk costs in construction
Table 4
Cost categoryOccurrenceIndustry rangeCFS ($/SF)Wood ($/SF)CFS totalWood total
Note: Wood construction experiences avg $12–28/SF in hidden costs. CFS's dimensional stability, factory precision, and non-combustibility reduce these risks.
Insurance & risk premium analysis
Table 5
Insurance typeCFS rateCFS costWood rateWood costSource
Case study: 4-story, 400-unit hotel documented CFS builder's risk at $360K vs wood at $1.6M — savings of $1.24M on insurance alone. (BuildSteel.org / US Assure) ✓ Verified
Environmental impact — recycled steel preserves forests
—
Trees' harvest pressure relieved
—
Tons CO₂ sequestered (20 yrs)
90%
Recycled content in CFS
100%
Recyclable at end of life

SFIA Cost Study

  • R.A. Smith National Study (June 2020)
  • CFS vs. wood cost comparison
  • Labor productivity analysis
  • Insurance differential data

RSMeans 2024

  • Gordian construction database
  • 930+ ZIP code cost factors
  • 160+ building type models
  • Regional labor indices

BuildSteel.org

  • Insurance case studies verified
  • Ohio hotel: 77% reduction
  • $1.24M documented savings
  • ISO classification data

IBC 2024

  • §602.3: Construction types
  • §2303.2: FRT requirements
  • §510.2: Podium rules
  • Table 504.4: Height limits

Estimates based on industry benchmarks: SFIA Cost Study (R.A. Smith National Study, June 2020), RSMeans 2024 Construction Cost Data (Gordian), BuildSteel.org Insurance Case Studies, and IBC 2024 Building Code Requirements. Actual costs vary significantly based on location, project specifics, market conditions, material availability, and contractor selection. Regional variation can exceed 70%. Insurance savings are based on documented case studies; actual premiums depend on carrier and project details. Results are indicative — request a 48-hour detailed cost analysis from AAC Steel for project-specific figures.

See your results

Fill the fields and get your project estimate.

Required
Required
Enter a valid email
Required

SMS consent is optional and separate from submitting this form. You may submit this form without opting in to SMS messages. If you choose to receive text messages from Atomic Ant Construction Inc. (AAC Steel), select one or both optional checkboxes below. Consent is not a condition of purchase.

Request received.

Our team reviews every project within one business day. You will hear from us shortly with cost, timeline, and structural guidance.