OUR WORK

The future of Steel frame

THE MATERIAL

Understanding Cold-Formed Steel.

Cold-formed steel represents a fundamental shift in how multifamily and commercial structures are built. Manufactured by precision-shaping steel coils at room temperature, it delivers what wood simply cannot: lightweight strength, dimensional accuracy, and inherent fire resistance. Making it the ideal structural system for buildings of 5 or more stories.

01

Faster Build Time

Our prefabricated steel components arrive ready for assembly, reducing on-site construction time by up to 20%. This efficiency translates to faster project completion, reduced labor costs, and quicker occupancy for your tenants.

02

Cost Effective

CFS eliminates the need for expensive Type IIIB podium construction, saving over $730,000 and 51 weeks of labor per floor. On a 50,000 sqft building, that's $3.75M in recaptured value before schedule gains are even calculated.

03

Structural Longevity

Steel doesn't rot, warp, shrink, or attract termites. A properly engineered CFS building maintains its structural integrity for 50+ years without the maintenance burden that compromises wood-framed structures.

04

Non-Combustible by Classification

CFS meets IBC non-combustible requirements, eliminating the expensive Type IIIB concrete podium required for wood-framed buildings above 5 stories.

05

Atomic Precision

Every steel frame we manufacture is precision-engineered using HOWICK machinery and advanced CAD software. We create complete framed layouts and run comprehensive load-bearing calculations on digital models, ensuring we understand every element of your building's structural integrity before a single component is shipped.

THE PROCESS

From Your Plans to Installation-Ready Kits.

Three phases. One partner. No gaps.

Phase 1 2–3 weeks

Design & Engineering

You provide architectural plans and project specifications. Our engineering team creates detailed 3D models of every structural component, optimized for fabrication, cost, and constructability.

Every load path is calculated. Every connection is verified.

BIM-integrated PE-stamped Ready to permit
Phase 2 2–3 weeks

Fabrication

Your approved design enters production. HOWICK roll-forming machinery processes raw steel coils into precision components to ±1/16” tolerance in our climate-controlled facility.

Load-bearing calculations verified at every stage. Quality checks before anything ships.

No field variability No weather delays No surprises
Phase 3 Per your schedule

Deliver & Support

Installation-ready kits arrive at your jobsite organized by floor and sequenced for your build schedule.

Your installation crews execute. We provide technical support and coordination throughout the process. You maintain complete control of the jobsite.

Floor-sequenced Technical support Your crew

AAC Steel Services

From concept to fabrication, we engineer every detail so your crew can build with confidence.

AAC Steel Products

Steel kits for every application. Engineered, fabricated, and delivered. Ready for your crew to assemble.

Architectural & Concept Support

Early-stage design development for cold-formed steel, backed by our in-house engineering firm, MP Design Consultants.

Structural Engineering

PE-stamped structural engineering, produced in-house. Every panel is engineered and sealed under our own license.

BIM & Shop Drawings

Fabrication-ready detailing and BIM coordination. Models are built to identify conflicts before fabrication and field work begin.

Fabrication

Roll-formed, CNC-fabricated CFS panels manufactured to ±1/16" tolerance. Noncombustible, fast to build, and predictable in the field.

Modular Construction

Volumetric building techniques through our modular arm, MassDwell, from value-add ADUs to high-volume modular production and multifamily volumetric stacking.

Installation & Erection

Full field installation of the panels we engineer and fabricate, completed by our own crews.

Steel Mezzanines

Freestanding steel mezzanine platforms with integrated stairs, for shops, factories, and commercial spaces adding square footage overhead.

Self-Assembly Steel Kits

Prefabricated CFS kits for walls, garages, and modular rooms, cut, packaged, and ready to assemble on site.

Partition Walls

Non-load-bearing steel partition walls for room separation, additions, and commercial fit-outs.

Steel Roofs

CFS roof systems, trusses and panels, engineered and fabricated to spec.

Steel Staircases

Fabricated steel stairs for commercial, industrial, and residential applications.

Steel Carports & Garages

Steel carport and garage structures, built and installed.

FAQ

Common questions.

Everything you need to know about working with AAC Steel from fabrication to delivery.

AAC Steel technical image

No. AAC Steel is a fabricator and manufacturing partner. We provide precision-engineered steel kits and technical support. Your installation crews or preferred trades handle on-site assembly.

From receiving your plans to delivery, expect 4–6 weeks total: 2–3 weeks for design and engineering, 2–3 weeks for fabrication. Timeline varies by project size and complexity.

Architectural plans and project specifications. From there, we handle engineering, modeling, and fabrication.

Yes. We integrate directly with your design team. Our BIM-compatible files are designed for seamless coordination.

Multi-family residential and commercial projects of 5 or more stories in the Northeast US.

Pricing is based on project specifications, square footage, and complexity. Use our Cost Analysis tool for an initial estimate, or contact us for a detailed quote within 48 hours.

Ready to start with us?

Send us your plans. We'll respond within 48 hours.

Start your project
5+ story projects only Northeast US Response within 48h